4.5 2 Reviews
Gildan® Dryblend® Pullover Hooded Sweatshirt
Type Ash
Quantity
36 total
Quantity | 36+ | 48+ | 72+ | 144+ | 250+ |
---|---|---|---|---|---|
Price | $39.20 | $35.64 | $32.97 | $30.44 | $28.10 |
Sizes
Additional charges apply
2XL + $7 ea
()
Oops, there was an issue with the upload. Please email your artwork to Crestline at crestlinehelp@crestline.com
Drag and drop your file above or click to select from a folder.
Preferred file types: AI, EPS, JPG, PDF, PNG, SVG, TIFF
Decoration Method
Additional Imprint Options
Product Total | $1,411.20 |
---|---|
1 Color Setup Charge | $47.00 |
Total | $1,458.20 USD |
Estimated Shipping Date
September 26
Details
Stay comfortable and dry in this Gildan® hoodie!
• Gildan® heavyweight 9.3 oz. hooded sweatshirt made from 50/50 cotton/poly.
• Moisture wicking properties keep you comfortable and dry.
• Double lined hood with dyed drawcords to match.
• Heat transfer label makes this tagless and comfortable to wear.
Price is determined based on color selected.
Size: S-2XL; 2XL additional charges will apply
Imprint: One color. Multiple colors/locations available for additional charges.
Imprint Area: 3 1/2"W x 3 1/2"H (left chest); 5"W x 9 1/2"H (vertical left side); 12"W x 14"H (full back); 12"W x 9 1/2"H (full front); 3 1/2"W x 15"H (L/R sleeve); 4"W x 3 1/2"H (upper back)
• Gildan® heavyweight 9.3 oz. hooded sweatshirt made from 50/50 cotton/poly.
• Moisture wicking properties keep you comfortable and dry.
• Double lined hood with dyed drawcords to match.
• Heat transfer label makes this tagless and comfortable to wear.
Price is determined based on color selected.
Size: S-2XL; 2XL additional charges will apply
Imprint: One color. Multiple colors/locations available for additional charges.
Imprint Area: 3 1/2"W x 3 1/2"H (left chest); 5"W x 9 1/2"H (vertical left side); 12"W x 14"H (full back); 12"W x 9 1/2"H (full front); 3 1/2"W x 15"H (L/R sleeve); 4"W x 3 1/2"H (upper back)
- Setup Charge: $47
- Production Time: 5 working days (does not include payment, art prep, or shipping time)
- FOB: NY
Production & Shipping
- Processing: September 17 – September 18 Your proof will be emailed to you for approval within 1 business day.
- Production: September 19 – September 25 Please allow 5 working days for us to imprint your items and prepare them for shipment.
- Estimated Ship Date: September 26 We estimate your items will leave the factory on this date.
All dates are based on weekdays and certain customization options may require additional processing time.
Need It Faster?
Rush service may be available. Call 1-866-488-4975 or chat us to inquire on availability.
Customer Reviews
4.5
4 Stars
October 19, 2021
Good job
5 Stars
July 22, 2015
Great for team gifts!